Not much more to go now
Change is a really handy tool. I’m in the business of delivering projects which always means change. So when it came to managing some change at home I thought I knew what I was doing. When I say change I mean a little bit of landscaping that a fellow ham was going to do and at the same time put in a new cables and a post ready for my new mast and antenna. This mean a bit of planning, cost control and some stakeholder management. Or so I thought.
I had originally decided on extending the house and had some lovely plans drawn up (which included a mast and antenna), put them through planning (domestic / xyl and local council) had them approved only to find that the local builders wanted huge sums for a small job. Hence the scope was reduced to meet the budget.
For the last few weeks I have toiled int he freezing rain to drill new holes in the side of the house, removed old and corroded (poor finishing by me) cables and then set about running new ones before removing some old decking that was the cause of our problem (wooden decking and West Cumbria should be avoided). What is going to go in its place is a mast stub in the ground, ground mounted rotator, heavy duty 12.5m mast and a folding hexbeam.
The schedule is hectic but I imagine in a matter of 4 weeks I will be back on the air on hf and there will be a very tired out g7kse, ready for for some leisurely operating on hf and perhaps in time for some early Es. Until then its the UKAC VHF tuesday nights for me still.